EMCL LTD QUALITY CONTROL SIGN-OFF FORM (FIRST FIX)
Project Name:
*
House No:
*
Street Name:
*
Cell No:
Date Of Inspection:
*
Date Of Re-Inspection:
Name:
*
First
Last
E-mail:
GROUND FLOOR
GF1 - IN THE UTILITY, THE WALL THAT RUNS PARRALLEL TO THE STAIRS NEEDS TO BE 1250MM LONG TIMBER TO TIMBER. IS THIS AND ALL OTHER WORK COMPLETE UNDER THE STAIRS?
*
COMPLETE
NOT COMPLETE
GF2 - ARE ALL STUD WALLS CHECKED FOR PLUM / LINE (TOP, MIDDLE AND BOTTOM) & SQUARE
*
COMPLETE
NOT COMPLETE
GF3 - ARE THE SOLE AND HEAD PLATES NAILED OFF ON THE GROUND FLOOR?
*
COMPLETE
NOT COMPLETE
GF4 - ARE ALL PLASTERBOARD GROUNDS THAT ARE REQUIRED PRESENT IN THE WALLS AND CEILINGS? THESE GROUNDS MUST BE FULL PIECES.
COMPLETE
NOT COMPLETE
GF5 - ARE ALL BOXINGS LEVEL & SQUARE? (IF NOT DONE BY EMCL PUT N/A)
*
COMPLETE
NOT COMPLETE
GF6 - AT ALL SVP'S, A FRAME OF TIMBER IS REQUIRED (100 X 25MM). WHEN CREATED THERE MUST BE A CLEAR SPACE OF 50MM BETWEEN FIRE PROOF AND FRAME. ARE THESE FITTED?
*
COMPLETE
NOT COMPLETE
GF7 - ARE WINDOWBOARDS LEVEL? WHERE YOU HAVE 2 WINDOWS WITHIN THE SAME ROOM THEY MUST BE LEVEL FROM ONE TO THE OTHER. FOR THIS TO HAPPEN WE MAY HAVE TO NOTCH OVER STRAPPING.
*
COMPLETE
NOT COMPLETE
GF8 - ARE ALL DOOR OPENINGS THE RIGHT SIZE AND CENTRED FROM WALL TO WALL WHERE REQUIRED? ENSURE ALSO THAT THE LEGS OF THE OPENING ARE ALIGNED AND PLUMB
*
COMPLETE
NOT COMPLETE
GF9 -HAVE ALL FIXINGS (NAILS & SCREWS) A FULL COVER OF TIMBER AROUND THEM? ENSURE THAT NO NAIL OR SCREW POINTS ARE VISABLE.
*
COMPLETE
NOT COMPLETE
GROUND FLOOR TO FIRST FLOOR
G2FF1 - CLEAR SPACE OF 840MM FROM THE PARTY WALL BOARD TO THE NEWEL. IS THIS CORRECT?
*
COMPLETE
NOT COMPLETE
G2FF2 - CLEAR SPACE OF 2035MM IS REQUIRED VERTICALLY FROM THE RAKE OF THE STEPS IN THE STAIRS TO THE BULKHEAD. IS THIS CORRECT?
*
COMPLETE
NOT COMPLETE
G2FF3 - IS THE GROUNDS FOR THE DUST BOARD COMPLETE AND ARE THEY POSITIONED DOWN 20MM FOR PLASTERBOARD?
*
COMPLETE
NOT COMPLETE
G2FF4 -IS THE STUD WALL BESIDE THE STAIRS CHECKED FOR PLUM / LINE (TOP, MIDDLE AND BOTTOM) & SQUARE? CHECK ALSO THAT THE FLOOR DECKS ARE NOT PROTRUDING ON THE LINE OF THE STUD WALL
*
COMPLETE
NOT COMPLETE
G2FF5 - IS THERE A SOLID PIECE OF 150MM X 44MM PIECE OF TIMBER SECURED WITHIN THE STUDDING ON BOTH SIDES OF THE LANDING? THIS IS TO PICK UP THE BOLTS COMING THROUGH THE STUD WALL FROM THE LANDING TRIMMERS.
*
COMPLETE
NOT COMPLETE
G2FF6 -IS THERE 4 VERTICAL LEGS (2 EITHER SIDE) GOING FROM THE SOLID TIMBER TO THE SOLE PLATE WITHIN THE STUD WALL? THIS IS TO CARRY THE SOLID TIMBER THAT IS PICKING UP THE BOLTS COMING FROM THE STAIR TRIMMERS ON THE OPPOSITE SIDE OF THE WALL
*
COMPLETE
NOT COMPLETE
G2FF7 - IS THERE A 140MM BOLT @ 400MM CENTRES GOING THROUGH THE SOLID PIECE OF TIMBER WITHIN THE STUD WALL TO PICK UP THE TRIMMERS WITHIN THE STAIRWELL? ENSURE THAT THERE IS WASHERS ON THE BOLT AND THAT THE NUTS ARE TIGHT.
*
COMPLETE
NOT COMPLETE
G2FF8 - IS THERE GROUNDS IN THE WALL TO FIX THE NEWEL POSTS TO?
*
COMPLETE
NOT COMPLETE
G2FF9 - ARE ALL TEMPORARY HANDRAILS IN POSITION AROUND THE STAIRS?
*
COMPLETE
NOT COMPLETE
G2FF10 - HAVE ALL FIXINGS (NAILS & SCREWS) A FULL COVER OF TIMBER AROUND THEM? ENSURE THAT NO NAIL OR SCREW POINTS ARE VISABLE.
*
COMPLETE
NOT COMPLETE
FIRST FLOOR
FF1 - THE BATH REQUIRES A TIMBER TO TIMBER DIMENSION OF 1,740MM X 750MM. IS THIS CORRECT?
*
COMPLETE
NOT COMPLETE
FF2 - SHOWER DIMENSIONS - IN THE B TYPES THE ENSUITE SHOWER OPENING NEEDS TO BE 1,240MM X 850MM, IN THE BATHROOM THE SHOWER OPENING NEEDS TO BE 940MM X 940MM; IN THE E-TYPES - THE ENSUITE SHOWER OPENING IS 1,840MM X 940MM, IN THE BATHROOM THE SHOWER OPENING IS 1,040MM X 940MM; MAKE SURE ALL WALLS ARE PLUMB AND SQUARE; ARE THE DIMENSIONS CORRECT?
*
COMPLETE
NOT COMPLETE
FF3 - ARE ALL STUD WALLS CHECKED FOR PLUM / LINE (TOP, MIDDLE AND BOTTOM) / SQUARE ON THE FIRST FLOOR? PAY SPECIAL ATTENTION TO THE BATH AND SHOWER STUDS.
*
COMPLETE
NOT COMPLETE
FF4 - IS THE SOLE AND HEAD PLATES IN THE STUDDING NAILED OFF ON THE FIRST FLOOR?
*
COMPLETE
NOT COMPLETE
FF5 - ARE THE NOGGINGS INSTALLED IN THE CEILING SO AS THE 4 SIDES OF THE BOARD HAVE CONTINUOUS TIMBER AROUND THEM?
*
COMPLETE
NOT COMPLETE
FF6 - IS THE TIMBERS THAT IS SCREWED TO THE SPANDREL WALL ON PLANE WITH THE CEILING?
*
COMPLETE
NOT COMPLETE
FF7 - ARE ALL BOXINGS LEVEL & SQUARE (IF NOT DONE BY EMCL PUT N/A)?
*
COMPLETE
NOT COMPLETE
FF8 - AT ALL SVP'S, A FRAME OF TIMBER IS REQUIRED (100 X 25MM). WHEN CREATED THERE MUST BE A CLEAR SPACE OF 50MM BETWEEN FIRE PROOF AND FRAME. ARE THESE FITTED?
*
COMPLETE
NOT COMPLETE
FF9 - ARE ALL TEMPORARY HANDRAILS IN POSITION AROUND THE LANDING?
*
COMPLETE
NOT COMPLETE
FF10 - ARE THE FLOORS SCREWED DOWN IN THE BATHROOM AND ENSUITE? THE MAX CENTRE OF SCREW IS 200MM
*
COMPLETE
NOT COMPLETE
FF11 - ARE ALL PLASTERBOARD GROUNDS THAT ARE REQUIRED PRESENT IN THE WALLS AND CEILINGS? THESE GROUNDS MUST BE FULL PIECES.
*
COMPLETE
NOT COMPLETE
FF12 - IS THERE GROUNDS LEFT IN THE WALL TO PICK UP THE SHOWER SCREEN?
*
COMPLETE
NOT COMPLETE
FF13 - IS THERE GROUNDS LEFT IN THE WALL TO PICK UP THE BATH SCREEN?
*
COMPLETE
NOT COMPLETE
FF14 - ARE WINDOWBOARDS LEVEL? WHERE YOU HAVE 2 WINDOWS WITHIN THE SAME ROOM THEY MUST BE LEVEL FROM ONE TO THE OTHER. FOR THIS TO HAPPEN WE MAY HAVE TO NOTCH OVER STRAPPING.
*
COMPLETE
NOT COMPLETE
FF15 - ARE ALL DOOR OPENINGS THE RIGHT SIZE AND CENTRED FROM WALL TO WALL WHERE REQUIRED? ENSURE ALSO THAT THE LEGS OF THE OPENING ARE ALIGNED AND PLUMB
*
COMPLETE
NOT COMPLETE
FF16 - IS THE GAP FILLED BETWEEN THE TOP STEP AND THE FLOOR?
*
COMPLETE
NOT COMPLETE
FF17 - IS THERE ANY HOLES IN THE FLOORS THAT NEED FILLING?
*
COMPLETE
NOT COMPLETE
FF18 - IS THERE A 150MM X 44MM TIMBER TRACKING ALL STUDDING IN ALL TYPES EXCEPT THE E-TYPE WHERE IT IS ONLY REQUIRED IN THE PARTY WALLS BETWEEN THE BEDROOMS?
*
COMPLETE
NOT COMPLETE
FF19 - HAVE ALL FIXINGS (NAILS & SCREWS) A FULL COVER OF TIMBER AROUND THEM? ENSURE THAT NO NAIL OR SCREW POINTS ARE VISABLE.
*
COMPLETE
NOT COMPLETE
SECOND FLOOR
Does This Building Have A Second Floor (If "NO" - Skip Remaining Fields)
SF1 - ARE ALL STUD WALLS CHECKED FOR PLUM / LINE (TOP, MIDDLE AND BOTTOM) / SQUARE ON THE FIRST FLOOR? PAY SPECIAL ATTENTION TO THE BATH AND SHOWER STUDS.
COMPLETE
NOT COMPLETE
SF2 - IS THE SOLE AND HEAD PLATES IN THE STUDDING NAILED OFF ON THE FIRST FLOOR?
COMPLETE
NOT COMPLETE
SF3 - ARE THE NOGGINGS INSTALLED IN THE CEILING SO AS THE 4 SIDES OF THE BOARD HAVE CONTINUOUS TIMBER AROUND THEM?
COMPLETE
NOT COMPLETE
SF4 - IS THE TIMBERS THAT IS SCREWED TO THE SPANDREL WALL ON PLANE WITH THE CEILING?
COMPLETE
NOT COMPLETE
SF5 - ARE ALL BOXINGS LEVEL & SQUARE (IF NOT DONE BY EMCL PUT N/A)?
COMPLETE
NOT COMPLETE
SF6 - AT ALL SVP'S, A FRAME OF TIMBER IS REQUIRED (100 X 25MM). WHEN CREATED THERE MUST BE A CLEAR SPACE OF 50MM BETWEEN FIRE PROOF AND FRAME. ARE THESE FITTED?
COMPLETE
NOT COMPLETE
SF7 - ARE ALL TEMPORARY HANDRAILS IN POSITION AROUND THE LANDING?
COMPLETE
NOT COMPLETE
SF8 - ARE THE FLOORS SCREWED DOWN IN THE BATHROOM AND ENSUITE? THE MAX CENTRE OF SCREW IS 200MM
COMPLETE
NOT COMPLETE
SF9 - ARE ALL PLASTERBOARD GROUNDS THAT ARE REQUIRED PRESENT IN THE WALLS AND CEILINGS? THESE GROUNDS MUST BE FULL PIECES.
COMPLETE
NOT COMPLETE
SF11 - IS THERE GROUNDS LEFT IN THE WALL TO PICK UP THE BATH SCREEN?
COMPLETE
NOT COMPLETE
SF12 - ARE WINDOWBOARDS LEVEL? WHERE YOU HAVE 2 WINDOWS WITHIN THE SAME ROOM THEY MUST BE LEVEL FROM ONE TO THE OTHER. FOR THIS TO HAPPEN WE MAY HAVE TO NOTCH OVER STRAPPING.
COMPLETE
NOT COMPLETE
SF13 - ARE ALL DOOR OPENINGS THE RIGHT SIZE AND CENTRED FROM WALL TO WALL WHERE REQUIRED?
COMPLETE
NOT COMPLETE
SF14 - IS THE GAP FILLED BETWEEN THE TOP STEP AND THE FLOOR?
COMPLETE
NOT COMPLETE
SF15 - IS THERE ANY HOLES IN THE FLOORS THAT NEED FILLING?
COMPLETE
NOT COMPLETE
SF16 - IS THERE A 150MM X 44MM TIMBER TRACKING ALL STUDDING IN THE E-TYPE'S?
COMPLETE
NOT COMPLETE
SF17 -HAVE ALL FIXINGS (NAILS & SCREWS) A FULL COVER OF TIMBER AROUND THEM? ENSURE THAT NO NAIL OR SCREW POINTS ARE VISABLE.
COMPLETE
NOT COMPLETE
ROOF SPACE
RS1 - IS THE PLASTIC REMOVED FROM THE ATTIC SPACE?
*
COMPLETE
NOT COMPLETE
CLEANING
CN1 - HAS THE HOUSE BEEN CLEARED OF ALL EXCESS TIMBER, FIXINGS, TUBES OF ADHESIVE / SILICONE, PLASTIC ECT? ALL EXCESS MATERIALS LESS OFF CUTS IS TO BE SENT BACK TO THE COMPOUND / CONTAINER OR MOVED ONTO THE NEXT HOUSE.
*
COMPLETE
NOT COMPLETE
CN2 - IS THE HOUSE SWEPT OUT FOR THE NEXT TRADE?
*
COMPLETE
NOT COMPLETE
CRITICAL DIMENSIONS
CD1 - STRUCTURAL OPENINGS - LIVING ROOM, W/C & KITCHEN - 2,097 X 952MM; UNDERSTAIRS STORE - 1,795 X 802MM; UTILITY - 2,097 x 852MM; BEDROOMS 2,097MM X 902MM; ENSUITE - 2,097MM X 802MM; BATHROOM - 2,097MM X 902MM; HOTPRESS - 2,097MM X 852MM
*
COMPLETE
NOT COMPLETE
CD2 - BATH DIMENSIONS - 1,740MM X 750MM; THE WIDTH IS ALREADY PRE-DETERMINED; MAKE SURE ALL WALLS ARE PLUMB AND SQUARE
*
COMPLETE
NOT COMPLETE
CD3 -SHOWER DIMENSIONS - IN THE B TYPES THE ENSUITE SHOWER OPENING NEEDS TO BE 1,240MM X 850MM, IN THE BATHROOM THE SHOWER OPENING NEEDS TO BE 940MM X 940MM; IN THE E-TYPES - THE ENSUITE SHOWER OPENING IS 1,840MM X 940MM, IN THE BATHROOM THE SHOWER OPENING IS 1,040MM X 940MM; MAKE SURE ALL WALLS ARE PLUMB AND SQUARE
*
COMPLETE
NOT COMPLETE
CD4 - STAIR DIMENSIONS- FROM THE PLASTERBOARD IN THE PARTY WALL TO THE FACE OF THE NEWEL NEEDS TO BE 840MM CLEAR SPACE
*
COMPLETE
NOT COMPLETE
CD5 - STAIR DIMENSIONS- FROM THE FURTHEST POINT OF THE BULKHEAD TIMBER, PLUMBED DOWN TO THE RAKE LINE FROM BULLNOSE TO BULLNOSE NEEDS TO BE NO LESS THAN 2035MM
*
COMPLETE
NOT COMPLETE
CD6 - UTILITY DIMENSIONS - 1250MM FROM TIMBER TO TIMBER
*
COMPLETE
NOT COMPLETE
DEFECTS
Record defect information below. Please specify the defect task eg FF1 with a description and a photo if available.
Photo 1:
Photo 2:
Photo 3:
Textarea: